Step1: Purification and sterilization By pumping raw water from the Zamzam well through two giant pumps with a capacity of (360) cubic meters per hour, which withdraws Zamzam water from the well and pumps it to the King Abdullah Project for the Development of Zamzam Water, which in turn stores water and performs sterilization works, then sends Zamzam water to the Zamzam reservoir station. And to King Abdulaziz Sabeel station. The stage of pumping the water withdrawn from the two pumps Blessed water is pumped through raw water transmission lines,…